Table 1.
Target | Patch | Maximum Change (mm) | Minimum Change (mm) | Mean Change (mm) | Standard Deviation (mm) |
---|---|---|---|---|---|
Ta3 | A | 57.86 | 50.70 | 54.11 | 2.05 |
B | −10.09 | −8.98 | −9.57 | 0.56 | |
C | 41.36 | 17.04 | 29.25 | 7.32 | |
D | −4.81 | −1.10 | 0.99 | 2.92 | |
Ta6 | A | −67.79 | −64.14 | −66.35 | 1.07 |
B | −31.28 | −30.95 | −31.08 | 0.17 | |
C | −41.32 | −21.02 | −31.86 | 6.14 | |
D | −7.42 | −3.32 | −4.96 | 1.64 | |
Ta7 | A | −59.88 | −56.48 | −58.65 | 1.00 |
B | −30.77 | −30.46 | −30.57 | 0.17 | |
C | −51.81 | −22.18 | −37.87 | 9.10 | |
D | −10.54 | −3.79 | −6.58 | 2.72 |