Skip to main content
. 2017 Feb 17;7:42913. doi: 10.1038/srep42913

Figure 2. Funnel plots and Egger’s test in the context of OS without and with trim and fill.

Figure 2

The pseudo 95% CI is computed as part of the analysis that produces the funnel plot and Egger’s test, and corresponds to the expected 95% CI for a given standard error (SE).