Skip to main content
. 2017 Jan 27;17(2):247. doi: 10.3390/s17020247

Figure 7.

Figure 7

The field test site arrangement and the on-line monitoring result of the disc insulator PD. (a) The field test site and the test arrangement; (b) The on-line monitoring result; (c) The coordinate system of the field test site arrangement.