Skip to main content
. Author manuscript; available in PMC: 2017 Apr 5.
Published in final edited form as: J Strength Cond Res. 2005 Feb;19(1):67–75. doi: 10.1519/14853.1

Table 3.

Results and quality measures for BM and MM.

S# M N p0 τa, τp τf, τn ka, κp kf, κn γ δ r2 r2Adj Cp PCI
1 BM 38 94.2 45 17 0.01 0.03 0.42 0.32 4.12 16
MM 38 94.2 56 7 0.04 0.08 6 0.1 0.48 0.36 3.74 18
2 BM 57 95.4 40 10 0.03 0.08 0.30 0.24 1.52 22
MM 57 94.2 24 23 0.78 0.74 1 10 0.32 0.21 1.60 29
3 BM 62 96.2 56 14 0.01 0.03 0.47 0.45 2.33 18
MM 62 97.1 37 30 0.43 0.67 6.9 0.4 0.54 0.48 2.28 24
4 BM 41 97.3 45 28 0.01 0.02 0.39 0.32 3.24 21
MM 41 99.1 39 21 0.22 0.42 0.1 1.2 0.57 0.48 2.76 31
5 BM 51 93.3 55 14 0.02 0.09 0.52 0.48 1.69 17
MM 51 95.4 54 14 0.06 0.24 1.2 1.6 0.58 0.51 1.66 31
6 BM 52 90.3 45 18 0.01 0.06 0.53 0.49 1.92 24
MM 52 89.1 40 18 0.43 0.67 0.9 4.3 0.57 0.51 2.02 24
7 BM 41 91.5 61 33 0.01 0.07 0.34 0.23 1.93 23
MM 41 90.1 56 11 0.44 0.11 0.4 5.1 0.55 0.44 1.91 23

M BM 48.7 94.0 49.6 19.1 0.01 0.05 0.42 0.36 2.39 20.1
SD 9.1 2.5 7.7 8.3 0.01 0.03 0.1 0.1 0.95 3.1

M MM 48.7 94.2 43.7 17.7 0.34 0.42 2.36 3.24 0.52 0.43 2.28 25.7
SD 9.1 3.6 12.1 7.8 0.26 0.28 2.83 3.54 0.1 0.1 0.75 4.8

S#, subject number; M model; BM, Banister model; MM, modified model; N, number of performances; p0 basic performance level; τa, τp, decay time constant for the positive performance component for the BM and MM, respectively (days); τf, τn, decay time constant for the negative performance component for the BM and MM, respectively (days); ka, kf, multiplying factors for the positive and negative component of training, respectively (a.u.); κp, κn, saturation threshold values for the positive and negative component of training, respectively (a.u.); γ time to reach threshold (a.u.); δ, sensitivity to training load (a.u.); r2 coefficient of determination; r2Adj adjusted coefficient of determination (the relationships between training and performance were significant (P <0.01) for the two models in all subjects); Cp, Mallow’s Cp score. PCI, number of actual performances included in the 95% CI of the estimated performances.