Skip to main content
. 2016 Nov 8;17(6):16–31. doi: 10.1120/jacmp.v17i6.6322

Table 5.

Estimated time‐saving from automating 19 (of 33) checklist items in the physics plan check

Activity Number of Plans Time Saved per Plan (min) Total Time Saved (min)
Plan check 2830 4.25 12028
IMRT/VMAT Plan check 1240 4.25 5270
First weekly chart check 2830 4.25 12028
Total time savings 29326 (488.8 hrs)