Skip to main content
. 2017 Mar 31;96(13):e6462. doi: 10.1097/MD.0000000000006462

Figure 3.

Figure 3

(A) Forest plot of the VAS at 48 hours; (B) funnel plot of VAS at 48 hours; and (C) sensitivity analysis of the VAS at 48 hours.