Table 2.
Receiver Operating Curve (ROC) analysis of the ZBI and IEQ against the GHQ-28 and CES-D
| GHQ-28 cut-off points | AUC – ZBI | AUC – IEQ | p-value 1 |
|---|---|---|---|
| 3/4 | 0.773 | 0.725 | 0.298 |
| 4/5 | 0.771 | 0.718 | 0.253 |
| 5/6 | 0.745 | 0.699 | 0.345 |
| 6/7 | 0.744 | 0.711 | 0.491 |
| CES-D cut-off point | |||
| 15/16 | 0.696 | 0.696 | 0.991 |
1 p-value for the comparison of AUC’s