Skip to main content
. 2016 Sep;18(5):697–706. doi: 10.1016/j.jmoldx.2016.04.003

Figure 5.

Figure 5

Survey results among team members. The figure offers an overview of the team size, composition, experience, as well as the overall attitude toward Agile and the project. Inst., institutional; IT, information technology; Preauth., preauthorization.