Skip to main content
. 2011 Jul 5;133(10):1010021–10100210. doi: 10.1115/1.4005001

Fig. 6.

Fig. 6

Contour plots displaying wall shear rate calculations along the orange line in Fig. 2(c) at the high PIV magnification. Data was collected every 10 ms in Fig. 6(a), and every 50 ms in Fig. 6(b).