Skip to main content
. 2017 May 2;5:e3217. doi: 10.7717/peerj.3217

Figure 3. Wall constructed to allow for the refilling of the excavation and passage of the small train on the overlying step during the excavation (A) and today (B).

Figure 3

The surrounding cliff did not progress since the 1930’s and marks the south-eastern limit of the quarry.