Skip to main content
. 2017 May 11;7:1730. doi: 10.1038/s41598-017-01824-y

Figure 3.

Figure 3

The recursively estimated number of bridge nodes in each iteration is plotted with the simulated values. The T = 12 line shows the average of 15 simulation runs.