Table 3.
Estimate | SE | t-test | p-value | |
---|---|---|---|---|
Intercept | 4.788 | 10.866 | 0.441 | 0.661 |
mRR | 0.064 | 0.026 | 2.432 | 0.018 |
SDRR | 0.120 | 0.058 | 2.044 | 0.046 |
The model was obtained based on the parameters in milliseconds and GA in weeks. Other results include: F-statistics: 6.08, p-value: 0.004, standard deviation of the error distribution: 5.55 (weeks), R-squared: 18%, adjusted R-squared 15%.