Skip to main content
. 2016 Nov 8;9(11):908. doi: 10.3390/ma9110908

Figure 1.

Figure 1

Photo series about CAD/CAM processing a PEEK secondary crown (PM) (a) scanned primary crown (0° taper), marked preparation border; (b) secondary crown construction; (c) setup-wizard of secondary crown with designed retainer; (d) milled secondary crown, end result.