Skip to main content
. 2017 Jun 8;8:990. doi: 10.3389/fpls.2017.00990

Figure 9.

Figure 9

Normalized results per ha for the sites Aberystwyth, Potash, and Wageningen—Part 3. Utilization pathways: 1. Small-scale combustion—chips; 2. Small-scale combustion—pellets; 3. Large-scale combustion—biomass baled for transport and storage; 4. Large-scale combustion—pellets; and 6. Large-scale production of insulation material—biomass baled for transport and storage.