Skip to main content
. 2016 Dec 14;8(20):33884–33896. doi: 10.18632/oncotarget.13934

Figure 3. Funnel plots without (up column) and with (low column) trim and fill.

Figure 3

The pseudo 95% confidence interval (CI) is computed as part of the analysis that produced the funnel plot and corresponds to the expected 95%CI for a given standard error (SE). HR indicates hazard ratio.