Table 3. Criteria of delay.
Criteria of Case Delay | Definition | Events |
Previous Case Run Over | Previous case runs over resulted in delay of the case to follow by 60 minutes | 100 |
Case Order Change | Provider manipulated case order on the day of surgical procedure resulted in delay of case schedule time over 60 minutes | 24 |
Provider Late | Provider is not in the operating room 15 minutes after the scheduled time, resulted in case delayed over 60 minutes | 18 |
Patient Late | Patient is not in the preoperative holding area 30 minutes prior to the scheduled time and resulted in case delay over 60 minutes | 12 |
Bump by Emergency | Emergency case takes priority for availability of room and provider, resulted in original case delay over 60 minutes | 5 |
Patient Not NPO | Patient arrived at preoperative holding without adequate NPO status and resulted in case delay over 60 minutes | 3 |
Others | Medical clearance required, patient is not ready, etc. | 6 |
TOTAL | 168 |