Skip to main content
. 2017 Jun 19;114(26):6722–6727. doi: 10.1073/pnas.1610381114

Fig. 1.

Fig. 1.

This figure (figure 4B from ref. 11) shows hydropower supply rates peaking at nearly 1,300 GW, despite the fact that the proposal calls for less than 150 GW hydropower capacity. This discrepancy indicates a major error in their analysis. Modified from ref. 11.