Skip to main content
. 2017 Jul 6;11(7):e0005661. doi: 10.1371/journal.pntd.0005661

Fig 2. Annual runoff volume (108 m3) of Dongting Lake before and after the operation of the Three Gorges Dam.

Fig 2

Three outlets represented Songzi, Taipin, and Ouchi. Four tributaries represented Xiang, Zi, Yuan and Li rivers.