Table 2. Results of the cross-validation procedure.
Stage | Estimation set | Estimated parameters | Sum of CV% | CVPEE | |||
---|---|---|---|---|---|---|---|
SRex (CV%) | km (CV%) | ke (CV%) | RaIL6 | ||||
pg·ml-1·min-1 | min-1 | min-1 | pg·min-1 | ||||
1 | D1 | 0.045 (7) | 0.004 (10) | 0.053 (<1) | <18 | 17.5 | 1,261 |
2 | D2 | 0.014 (9) | 0.002 (<1) | 0.012 (11) | <21 | 48.6 | 296 |
3 | D3 | 0.038 (171) | 0.0002 (189) | 0.0047 (92) | 452 | 107 | 58 |
4 | D4 | 0.637 (<1) | 0.00008 (23) | 0.013 (74) | <98 | 86.2 | 340 |