Skip to main content
. 2017 Aug 4;12(8):e0181818. doi: 10.1371/journal.pone.0181818

Fig 11. ANOVA plot for time spent on task.

Fig 11

The plot shows ANOVA interaction between task type and geometric shape. Task types are: 1 –natural tracing, 2 –eyes-first and 3 –mouse-first. Shapes are: 1 –circle, 2 –rectangle, 3 –flower and 4 –star.