Skip to main content
. 2017 Aug 15;7:8303. doi: 10.1038/s41598-017-08235-z

Table 5.

Weather condition and image acquisition schedule during growing period.

DAT Stage Weather condition Image acquisition schedule
1 1 C B
2 S B
3 S A
4 C A
5 2 C B
6 C B
7 S A
8 C A
9 3 C B
10 C B
11 S A
12 C B
13 4 C A
14 C B
15 S A
16 C B
17 5 C A
18 C B
19 C A
20 S B

Note: DAT - days after transplanting, S - sunny, C - cloudy; A: image acquisition scheduled from 6:00 h to 18:00 h at 2 h intervals; B: image acquisition scheduled only at 14:00 h.