Skip to main content
. 2017 Jun 2;33(4):854–866. doi: 10.1002/btpr.2492

Table 7.

Batch Operational Risk for the Alternative Batch, Continuous, and Hybrid Manufacturing Strategies

Manufacturing Strategies USP Risk DSP Risk Overall Risk Score
Base case 1% 0.2% 1.2%
FB‐CB 1% 0.3% 1.3%
ATF‐CB 2.8% 2.3% 5.1%
FB‐CC 1% 1% 2%
ATF‐CC 2.8% 4.6% 7.4%