Skip to main content
. 2017 Jul 1;11(7):LC11–LC17. doi: 10.7860/JCDR/2017/28960.10280

[Table/Fig-3]:

Components of the work and workplace evaluation (n=30).

Components Number of participants (%)
Occupational region
Parampalli dock
Hoodeh dock
Thonse dock

9 (30.0)
7 (23.3)
14 (46.7)
Tasks involved
Rowing
Diving
Unloading

30 (100)
30 (100)
30 (100)
Working hours
8-10 hours
10-12 hours

25 (83.3)
5 (16.7)
Work schedule: Continuous 30 (100)