Skip to main content
. 2017 Sep 7;17(9):2055. doi: 10.3390/s17092055

Table 2.

Precision of clearance coordinate system (Unit: m).

Fitting Precision Data Set 1 Data Set 2 Data Set 3
Section No. Left Rail Right Rail Left Rail Right Rail Left Rail Right Rail
1 0.025 0.030 0.020 0.024 0.021 0.011
2 0.012 0.011 0.020 0.013 0.029 0.029
3 0.008 0.013 0.016 0.011 0.018 0.017
4 0.010 0.008 0.013 0.016 0.016 0.015
5 0.019 0.021 0.012 0.008 0.015 0.020
6 0.009 0.008 0.009 0.008 0.018 0.007
7 0.008 0.008 0.012 0.021 0.019 0.018
Mean value 0.013 0.014 0.014 0.014 0.019 0.017