Figure 2.
Simplified illustration of the peak compression process for an IM peak occupying six TW bins in the TT section which is compressed into three TW bins in the ST section using CR = 2. Importantly, the TW in the ST section must be switched to normal TW (i.e., same as in the TT section) for the compression to be “locked-in”.