Skip to main content
. 2017 Oct 26;8:1750. doi: 10.3389/fpls.2017.01750

Table 2.

Multiple change-point models estimated for rtcs lateral roots.

Posterior probability
DZ s.d. DZ-EZ limit EZ s.d. EZ-MZ limit First hair position MZ s.d. Segmentation Model SH model
A3 Linear 4.8 617 (548, 662) 12.9 1,385 (879, 1,421) 1,083 40.1 0.05 0 2
Variance 4.7 634 (553, 718) 13.1 1,385 (879, 1,421) 38.7 0.19* 0.53* 3
A1 Linear 3.4 535 (321, 649) 6 1,185 (1,112, 1,185) 1,078 43.6 0.14* 1* 3
Variance 3.4 583 (387, 775) 6.3 1,185 (1,112, 1,185) 43.3 0.08* 0.96* 3
A′36 Linear 2.1 506 (474, 506) 6.6 1,146 (997, 1,215) 965 21.8 0.13* 0.61* 3
Variance 2.1 506 (465, 510) 6.5 1,146 (997, 1,241) 21.3 0.15* 0.99* 3
A2 Linear 3.1 323 (16, 347) 11.4 744 (388, 828) 485 28 0.13* 0.01 2
Variance 3.1 347 (68, 347) 11.8 744 (347, 796) 27.6 0.12* 0.17 2
A′37 Linear 1.3 313 (298, 313) 6.1 707 (549, 828) 692 14.7 0.1* 0.95* 3
Variance 1.3 313 (288, 313) 3.8 455 (417, 707) 12.3 0.08* 0.94* 3
A′38 Linear 1.4 272 (267, 322) 4.3 505 (426, 505) 563 16.1 0.05* 0 2
Variance 1.5 295 (285, 318) 4.3 428 (402, 697) 15.5 0.05* 0.88* 3
A′39 Linear 8.8 980 (548, 1,118) 634 26.9 0.35* 0.2 1
Variance 8.6 980 (548, 1,118) 26.4 0.39* 0.91* 2
B15 Linear 5.8 520 (328, 819) 210 15.2 0.05 1* 2
Variance 5.6 596 (101, 654) 15.6 0.36* 0.9* 2

For each lateral root (ordered in decreasing length of the division zone), the piecewise linear model is described in the first row and the Gaussian change in the variance model estimated on the basis of the residual series is described in the second row. For each multiple change-point model, the standard deviations (s.d.) estimated for each zone −division zone (DZ), elongation zone (EZ) and mature zone (MZ)−, the limits between zones with associated 0.05-uncertainty intervals, the first root hair position (all in μm), the selected segmentation posterior probability −an asterisk indicates that the segmentation is the optimal one−, the selected model posterior probability −an asterisk indicates that the model is the one given by the slope heuristic (SH)−, and the number of zones given by the slope heuristic are given.