Skip to main content
. Author manuscript; available in PMC: 2017 Nov 2.
Published in final edited form as: Methods Mol Biol. 2017;1529:243–264. doi: 10.1007/978-1-4939-6637-0_12

Fig. 4.

Fig. 4

Divergence in the confidence score of the I-TASSER models for successfully and unsuccessfully designed sequences. Approximate cutoff values are indicated by the arrows. A C-score < −1.5 indicates a high probability that the design will not be folded correctly and a C-score > 0 indicates a high probability that the design will fold to the target structure