Skip to main content
. 2017 Sep 14;111(5):365–388. doi: 10.1007/s00422-017-0730-1

Fig. 25.

Fig. 25

Simulation-based comparison of multiple-schedule components to single-schedule concomitants. Left As for Svartdal (2008), the 80% component of the 80/40 schedule is compared to the 80/80 schedule component A. Right The 40% component of the 80/40 schedule is compared to the 40/40 schedule component B