Figure 2.
Comparison of proton beam depth dose curve in water obtained using a Zebra multilayer ionization chamber with that obtained using the MatriXX PT and Evolution in the DigiPhant water phantom. The buildup material thickness corrections of 6.2 mm and 3.1 mm were provided by IBA dosimetry.