Skip to main content
. 2017 Nov 16;7:15737. doi: 10.1038/s41598-017-15945-x

Table 2.

Forecast error for Syrian and English cities. The table shows the mean square error (MSE) between the forecast provided by each model xˆi(t) and the true value xi(t). The column Δ stands for the improvement of the prediction errors of the VAR model in respect to the AR model.

Preceding Average AR VAR Δ(%)
Damascus 0.717 0.552 0.500 0.478 +4.4
Aleppo 1.383 1.064 1.016 1.006 +1.0
Idlib 1.295 0.823 0.787 0.791 0.5
Daraa 0.901 0.638 0.635 0.570 +10.2
Homs 1.173 0.711 0.831 0.732 +11.9
London 0.017 0.017 0.011 0.011 0
Birmingham 0.088 0.059 0.052 0.051 +1.9
Leeds 0.110 0.066 0.061 0.060 +1.6
Liverpool 0.187 0.101 0.101 0.100 +1.0
Manchester 0.194 0.113 0.108 0.108 0