Skip to main content
. 2017 Nov 21;7:15882. doi: 10.1038/s41598-017-15723-9

Table 2.

Results of the multivariate GLM for the presence of rats inside dwellings. Odds ratio (OR) and 95% confidence intervals are presented for the variables retained in the final model.

 Parametric coefficients Odds Ratio 95% Confidence Interval p value
Litter (No) <0.001
Litter (Yes) 2.18 1.67–2.86
Width of plot (Same as dwelling) 0.03
Width of plot (less than 10 m) 0.52 0.30–0.88
Width of plot (less than 20 m) 0.66 0.41–1.07
Width of plot (20 m or more) 0.81 0.50–1.32
Animals outside (No) 0.01
Animals outside (Yes) 1.62 1.11–2.30
Nature of area (City centre) 0.001
Nature of area (Urban) 2.16 0.89–7.13
Nature of area (Suburban residential) 1.85 0.75–6.16
Nature of area (Rural residential) 3.23 1.22–11.18
Nature of area (Village centre) 3.23 1.13–11.63
Nature of area (Rural) 5.63 2.04–20.03
Drainage system faults (No) 0.006
Drainage system faults (Yes) 2.10 1.26–3.29
Problems in area (No problems) 0.002
Problems in area (Slight problems) 0.92 0.63–1.35
Problems in area (Moderate problems) 1.17 0.74–1.87
Problems in area (Substantial problems) 1.97 1.20–3.26
Tenure type (Owner occupied) 0.01
Tenure type (Private rented) 1.36 0.97–1.88
Tenure type (Local authority) 1.16 0.77–1.72
Tenure type (Housing association (RSL)) 1.92 1.29–2.81
Date of construction (Pre 1850) <0.001
Date of construction (1850–1899) 0.56 0.35–0.96
Date of construction (1900–1918) 0.46 0.26–0.79
Date of construction (1919–1944) 0.45 0.27–0.76
Date of construction (1945–1964) 0.24 0.14–0.42
Date of construction (1965–1980) 0.22 0.13–0.40
Date of construction (Post 1980) 0.19 0.10–0.36
Region (East Midlands) 0.002
Region (Eastern) 1.31 0.70–2.50
Region (London) 2.69 1.54–4.92
Region (North East) 0.85 0.36–1.88
Region (North West & Merseyside) 1.44 0.81–2.66
Region (South East) 1.43 0.80–2.66
Region (South West) 1.71 0.96–3.16
Region (West Midlands) 2.01 1.14–3.71
Region (Yorkshire & Humberside) 1.09 0.57–2.10

The p-value refers to the Chi-square test for analysis of deviance (model with factor included compared to model without the factor). The variables year of survey, month of survey, type of dwellings and type of roads were not retained in the final model.