Skip to main content
. 2017 Nov;56(6):742–751.

Figure 1.

Figure 1.

Room preparation prior to VHP exposure. Room volume was calculated and programmed via the (A) electronic console outside of the room which controlled the (B) VHP generator and aeration catalytic accelerator, which were positioned inside the room with housing equipment to be decontaminated. HVAC supply and exhaust vents and ceiling thimble connections were covered and the (C) room door sealed with tape.