Table 1.
Acceptance Testing and Commissioning | |
---|---|
Procedure | |
Customer acceptance procedures | |
TPS integration | |
OIS integration | |
Establish routine QA baselines | |
QA documentation | |
Routine Quality Assurance | |
Procedure | Tolerance |
Daily | |
Safety/interlocks | Functional |
Imaging‐treatment isocenter coincidence (SRS only) | 1 mm |
Positioning/repositioning (SRS only) | 1 mm |
Imaging‐treatment isocenter coincidence (SBRT only) | 2 mm |
Positioning/repositioning (SBRT only) | 2 mm |
Weekly | |
Imaging‐treatment isocenter coincidence (non‐SRS/SBRT) | 2 mm |
Positioning/repositioning (non‐SRS/SBRT) | 2 mm |
Semi‐annually | |
Image scaling | 2 mm |
Annually | |
Imaging dose | |
2D MV | of baseline value |
2D kV (static imaging mode) | of baseline value |
2D kV (fluoroscopy mode) | of baseline value |
All 3D imaging modes | of baseline value |
Image quality | |
2D (spatial resolution, contrast) | Baseline value |
3D (uniformity, spatial resolution, contrast) | |
Upgrade/Repair/Service | |
Verify / Reestablish QA baselines (as appropriate) |
; .