Table 1.
Recommended minimum practices for commissioning and QA of an IGRT system
| Acceptance Testing and Commissioning | |
|---|---|
| Procedure | |
| Customer acceptance procedures | |
| TPS integration | |
| OIS integration | |
| Establish routine QA baselines | |
| QA documentation | |
| Routine Quality Assurance | |
| Procedure | Tolerance |
| Daily | |
| Safety/interlocks | Functional |
| Imaging‐treatment isocenter coincidence (SRS only) | 1 mm |
| Positioning/repositioning (SRS only) | 1 mm |
| Imaging‐treatment isocenter coincidence (SBRT only) | 2 mm |
| Positioning/repositioning (SBRT only) | 2 mm |
| Weekly | |
| Imaging‐treatment isocenter coincidence (non‐SRS/SBRT) | 2 mm |
| Positioning/repositioning (non‐SRS/SBRT) | 2 mm |
| Semi‐annually | |
| Image scaling | 2 mm |
| Annually | |
| Imaging dose | |
| 2D MV | of baseline value |
| 2D kV (static imaging mode) | of baseline value |
| 2D kV (fluoroscopy mode) | of baseline value |
| All 3D imaging modes | of baseline value |
| Image quality | |
| 2D (spatial resolution, contrast) | Baseline value |
| 3D (uniformity, spatial resolution, contrast) | |
| Upgrade/Repair/Service | |
| Verify / Reestablish QA baselines (as appropriate) | |
; .