Skip to main content
. 2017 Dec 1;7:16738. doi: 10.1038/s41598-017-16821-4

Table 2.

Estimated regression coefficients and adjusted standard errors (±SE) coefficient of determination ( R 2 adj ), model bias (E®), and root mean square error (±RMSE) of aboveground biomass equations.

System Model Parameter Estimate SE R 2 adj(%) E® (%) RMSE (%)
1 m1 b01 0.0204 0.0371 85.409 −0.549 19.588
b11 1.9908 0.6453
b21 1.0264 0.8239
m2 b02 0.0208 0.0313 85.407 −0.551 19.589
b12 1.0035 0.1581
2 m1 b01 0.1563 0.1784 90.699 −0.221 16.911
b11 3.0839 1.0899
b21 −0.7883 1.2929
m2 b02 0.0601 0.0586 88.996 0.040 18.390
b12 0.8691 0.1163
3 m1 b01 0.0737 0.1087 90.182 −0.922 19.953
b11 1.8942 0.5883
b21 0.6112 0.9028
m2 b02 0.0534 0.0480 90.112 −0.857 20.023
b12 0.8678 0.1086
4 m1 b01 0.0895 0.0659 94.741 −0.769 16.781
b11 1.4018 0.6370
b21 1.0429 0.8270
B2 b02 0.1027 0.0543 94.706 −0.857 16.836
b12 0.7960 0.0621