Skip to main content
. 2013 Jan 7;14(1):176–191. doi: 10.1120/jacmp.v14i1.4052

Table 6.

Estimated time required to generate IMRT plans.

Manual Planning Automated Planning
Head and Neck
>4hrs
~8min
Anal Canal
>2hrs
~6min
Prostate with Pelvic Nodes > 1.5 hrs
~6min