Skip to main content
. 2012 Sep 6;13(5):140–154. doi: 10.1120/jacmp.v13i5.3837

Table 5.

Process flow timeline.

Steps Time Scale Experimental‐based Approach Computation‐based Method
1 Making a verification plan for measurements (IC and 2D verification plans) 35 min 15(capturing DynaLog)
2 Exporting verification plan for delivery 3 min
3 1D and 2D verification at LINAC 60 min
4 Data analysis of the measurement data 15 min
5 Export the plan from Pinnacle to Eclipse 10 min
6 Independent dose calculation in Eclipse 8 min
7 DVH comparison and analysis 6 min
8 Machine log analysis 3 min
9 Documentation 5 min 5 min
Total Time 118 min 47 min