Table 5.
Steps | Time Scale | Experimental‐based Approach | Computation‐based Method |
---|---|---|---|
1 | Making a verification plan for measurements (IC and 2D verification plans) | 35 min | 15(capturing DynaLog) |
2 | Exporting verification plan for delivery | 3 min | ‐ |
3 | 1D and 2D verification at LINAC | 60 min | ‐ |
4 | Data analysis of the measurement data | 15 min | ‐ |
5 | Export the plan from Pinnacle to Eclipse | ‐ | 10 min |
6 | Independent dose calculation in Eclipse | ‐ | 8 min |
7 | DVH comparison and analysis | ‐ | 6 min |
8 | Machine log analysis | ‐ | 3 min |
9 | Documentation | 5 min | 5 min |
Total Time | 118 min | 47 min |