Percent difference between calculated and measured monitor units for beams of energy 6, 9, 12, 16 and 20 MeV for cutout sizes of 5, 4, 3, 2 and 1 cm in water at 100 cm SSD using 10×10cm2 cone.

Electron Beam Energies
Cutout size 6 MeV 9 MeV 12 MeV 16 MeV 20 MeV
5 cm 1.2 0.5 0.3 0.0 1.4
4 cm 1.9 1.6 0.4 0.5 1.5
3 cm 1.2 0.6 1.2 1.2 2.4
2 cm 3.9 4.3 4.7 2.6 3.9
1 cm 43.5 34.3 24.9 13.5 8.2