Skip to main content
. 2017 Sep 20;162:1118–1134. doi: 10.1016/j.jclepro.2017.05.132

Table 9.

Market-related experiments.

Subsystem Experiments Statusa Known involved actorsb
Automotive sector
Light-weight trains E Ricardo UK Limited, Alstom (F)
Trams E Centre for Concepts in Mechatronix (NL), GKN plc (UK)
Urban buses C GKN plc (UK), Ricardo UK Limited, Torotrak plc (UK)
Passenger cars E GKN plc (UK), Jaguar XF (UK), Porsche (D), Ricardo UK Limited, Renault (F), Torotrak plc (UK), Volvo (SE),
Off-highway machinery (mobile cranes, construction machinery) E Centre for Concepts in Mechatronix (NL), GKN plc (UK), KAMAG Transporttechnik (D), Vycon (USA)
Refuse collection vehicles
E
Non-disclosure
Electricity grid sector Grid balancing (control reserve market) E/C Stornetic (D), Williams Advanced Engineering (UK), Beacon Power (USA), Boeing (USA), Calnetix (USA), Kinetic Traction Systems, LLC. (USA), Aspes (CH), Rotokinetik UG (D)c
Balancing of island grids E/C Williams Advanced Engineering (UK), Piller (D)c
Balancing of private grids (i.e. large industrial plants or public transport grids) C Rosseta Technik (D), Piller (D)c
Stabilization of critical nodes in the electricity grid P/E Non-disclosure
Decentralized home storage of renewable energies P Klimpfinger (AT)
Output leveling of single wind turbines P/E Enercon (D), Rotokinetik UG (D)c
Output leveling of solar or wind parks (in Austria) P Non-disclosure
Energy for storage for remote telecommunication station P Non-disclosure
Uninterrupted power supply (including cold start for emergency power systems) C Socomec (F), Kinetic Traction Systems LLC (USA), Calnetix Technologies LLC (USA), Piller (D)c
Balancing fluctuations in industrial applications (e.g. elevators or machines requiring important short-term power) E Rotokinetik UG (D), Piller (D)c
Provide power boost for experimental research (e.g. particle accelerators) C Piller (D)c
Fast charging stations for electric vehicles P Non-disclosure
Energy storage for spatial applications P Non-disclosure
a

We distinguish between planned (P), ongoing experiments (E), and successful experiments (commercialized) (C).

b

We provided company names whenever disclosure was allowed. See also Khammas (2007) and Dhand and Pullen (2013) for a chronological review.

c

Low-speed flywheels.