Skip to main content
. Author manuscript; available in PMC: 2017 Dec 13.
Published in final edited form as: Ann Appl Stat. 2017 Jul 20;11(2):967–991. doi: 10.1214/17-AOAS1026

Fig 2.

Fig 2

Estimates of tumor cell proportions as a function of true tumor cell percentages for the proposed method and ASCAT using dataset from Staaf et al. 2008. The 95% credible interval length for our estimates is always less than 2%. ASCAT does not include a standard error in its output.