Table 8.
Term | Estimate | SE | z | P |
---|---|---|---|---|
Intercept | −3.1528 | 1.0817 | −2.915 | 0.00356 |
Winter 2013 | −0.3457 | 0.8512 | −0.406 | 0.68468 |
Spring 2013 | 1.8095 | 0.8916 | 2.030 | 0.04240 |
Summer 2013 | 1.1719 | 0.9258 | 1.266 | 0.20558 |
Autumn 2013 | 1.6651 | 0.8421 | 1.977 | 0.04800 |
Number of samples | 0.7052 | 0.1399 | 5.042 | 4.61e−07 |
Anthelmintic treatment | −1.9807 | 0.9390 | −2.109 | 0.03490 |
Significant P-values are shown in bold. Likelihood ratio test comparing the full model to a null model containing only the random effect: x2 = 32.966, df = 6, P = 1.064e−0.5.