Table 6. Descriptive statistics and pairwise comparison of the decision-making and the execution of the pass between the different measures.
Mea-sure | Time (I) | Time (J) | Mean difference (I-J) |
Typical error | P | Differences 95% CI | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
T´ | M | SD | T´ | M | SD | LL | UL | ||||
DM | Pre1 | .586 | .225 | Int1 | .655 | .124 | -.069 | .041 | .645 | -.191 | .052 |
Pre1 | .586 | .225 | Pre2 | .645 | .174 | -.059 | .041 | 1.000 | -.182 | .064 | |
Pre1 | .586 | .225 | Int2 | .650 | .082 | -.064 | .050 | 1.000 | -.213 | .084 | |
Int1 | .655 | .124 | Pre2 | .645 | .174 | .010 | .035 | 1.000 | -.094 | .115 | |
Int1 | .655 | .124 | Int2 | .650 | .082 | .005 | .029 | 1.000 | -.083 | .093 | |
Pre2 | .645 | .174 | Int2 | .650 | .082 | -.005 | .037 | 1.000 | -.115 | .104 | |
EX | Pre1 | .483 | .201 | Int1 | .560 | .138 | -.077 | .040 | .412 | -.196 | 0.41 |
Pre1 | .483 | .201 | Pre2 | .555 | .154 | -.072 | .047 | .834 | -.211 | .067 | |
Pre1 | .483 | .201 | Int2 | .650 | .082 | -.168 | .047 | .014 | -.308 | -.027 | |
Int1 | .560 | .138 | Pre2 | .555 | .154 | .005 | .036 | 1.000 | -.103 | .114 | |
Int1 | .560 | .138 | Int2 | .650 | .082 | -.090 | .032 | .078 | -.187 | .007 | |
Pre2 | .555 | .154 | Int2 | .650 | .082 | -.095 | .040 | .172 | -.214 | .024 |
Note. M = mean; SD = standard deviation; DM: Decision-making; EX: Execution; T´: Time; Pre 1: 1st pre-intervention phase; Int 1: 1st intervention phase; Pre 2: 2nd pre-intervention phase; Int 2: 2nd intervention phase; I: first time; J: second time; CI: confidence interval; LL: lower limit; UL: upper limit.