Skip to main content
. Author manuscript; available in PMC: 2018 Jan 11.
Published in final edited form as: J Risk Uncertain. 2016 Sep 13;52(3):233–254. doi: 10.1007/s11166-016-9242-y

Table 2.

Results of the model recovery simulation.

Design p(CS) RMSE(r) RMSE(s)
Kirby 0.351 0.0133 0.4251
Random 0.123 0.0246 0.1720
Geometric 0.319 0.0141 0.2947
ADO 0.999 0.0103 0.0675