Skip to main content
. 2018 Jan 12;17:1. doi: 10.1186/s12942-018-0121-4

Fig. 6.

Fig. 6

Access to facilities (emergency: map a PSC b and CSC c) at all points in the network with adverse weather conditions (reduction of regulation speed by 20 kph (12 mph) Scenario 3)