Skip to main content
. 2018 Jan 24;8:1486. doi: 10.1038/s41598-018-20035-7

Figure 6.

Figure 6

Schematic of the experimental setup for the τth measurements. Two fiber beam splitters (BS) and a motorized delay line were used to control the tD between the two pulses.