Skip to main content
. 2018 Jan 23;8(1):e018835. doi: 10.1136/bmjopen-2017-018835

Figure 1.

Figure 1

Joint distribution and incremental cost-effectiveness acceptability curve for time spent at the target SpO2 (multivariate parametric bootstrap). ICER, incremental cost-effectiveness ratio.