Skip to main content
. 2018 Jan 31;84(4):e02242-17. doi: 10.1128/AEM.02242-17

FIG 3.

FIG 3

Disconnection tests for measuring current production by the individual electrodes in MEC1 and MEC2. Top, three electrodes that were installed from top of the MECs (graphite foil, carbon felt, and graphite rod from top); bottom, duplicates that were installed near the bottom.