Table 4.
Statistical analysis of actuator position tracking errors under different control methods (with five subjects).
Participants | Methods | Maximum Error (mm) | Average Error (mm) | |||||
---|---|---|---|---|---|---|---|---|
A1 | A2 | A3 | A1 | A2 | A3 | |||
Position tracking results | Subject 1 | ABS-SMC | 1.10 | 1.13 | 1.33 | 0.43 | 0.47 | 0.49 |
BS-SMC | 2.71 | 3.60 | 3.24 | 1.30 | 1.48 | 1.56 | ||
Subject 2 | ABS-SMC | 1.52 | 2.07 | 1.76 | 0.39 | 0.47 | 0.37 | |
BS-SMC | 3.71 | 4.67 | 4.20 | 1.19 | 1.43 | 1.07 | ||
Subject 3 | ABS-SMC | 1.53 | 2.02 | 1.81 | 0.40 | 0.47 | 0.37 | |
BS-SMC | 3.90 | 5.01 | 4.19 | 1.17 | 1.46 | 1.10 | ||
Subject 4 | ABS-SMC | 1.77 | 2.07 | 1.88 | 0.39 | 0.48 | 0.38 | |
BS-SMC | 3.86 | 5.22 | 5.30 | 1.22 | 1.27 | 1.29 | ||
Subject 5 | ABS-SMC | 1.39 | 1.97 | 1.66 | 0.39 | 0.47 | 0.37 | |
BS-SMC | 3.74 | 4.96 | 4.63 | 1.14 | 1.34 | 1.09 |