Table 1. GLM for the PUUV incidences with four variable.
Coefficients: | Estimate | Std. Error | t value | Pr(>|t|) | |
---|---|---|---|---|---|
(Intercept) | 4.12E–04 | 6.95E–04 | 0.592 | 0.554 | |
Forest | 9.59E–03 | 2.21E–03 | 4.341 | 1.81E–05 | *** |
Urban | −2.95E–04 | 1.43E–03 | −0.207 | 0.8359 | |
AMT | −7.10E–06 | 7.38E–06 | −0.961 | 0.337 | |
AP | −9.15E–07 | 5.96E–07 | −1.535 | 0.1257 | |
Forest:urban | 1.38E–03 | 1.11E–03 | 1.242 | 0.2149 | |
Forest:AMT | −8.21E–05 | 2.01E–05 | −4.074 | 5.61E–05 | *** |
Forest:AP | −1.59E–06 | 7.92E–07 | −2.012 | 0.0449 | * |
Urban:AMT | 8.69E–06 | 1.24E–05 | 0.704 | 0.4819 | |
Urban:AP | −8.75E–07 | 7.00E–07 | −1.25 | 0.2119 | |
AMT:AP | 1.37E–08 | 7.25E–09 | 1.884 | 0.0602 | . |
Notes.
Significance codes:
0.001.
0.05.
0.1.