Skip to main content
. 2018 Feb 2;12:1. doi: 10.3389/fnint.2018.00001

Figure 5.

Figure 5

Switch cost by condition. Change in Switch Cost from blocks 1 to 10 for RT (A) and Accuracy (B) by Condition. NFB, No Feedback; AFB, Accuracy Feedback; DFB, Difficulty Aware Feedback; MFB, Monetary Feedback; BFB, Block Feedback. Error bars represent standard errors.