Skip to main content
. 2018 Feb 7;13(2):e0190641. doi: 10.1371/journal.pone.0190641

Fig 11. Results of full probabilistic analysis showing expected cost of hardening at next upgrade and probability of passing a cost-benefit test as a function of the terminal lifetime.

Fig 11